Project Description
This 5-level steel structure has a flat deck steel profile floor which is supported on a grid of secondary and primary steel beams. The columns are concrete filled steel hollow sections founded on 600Ø displacement reinforced concrete piles. Bracing is provided by 5 EBF steel frames supported on a cluster of angled screwed piles.
All steel elements and precast on this project was detailed in Pro-Steel preventing the need for production of time consuming shop drawings and the associated approvals, greatly reducing off-site fabrication times and ensuring all ‘fast track’ objectives of this project were met. The Client had absolute timeframes that could not be compromised.